Warning: mkdir(): No space left on device in /www/wwwroot/new16.com/func.php on line 127

Warning: file_put_contents(./cachefile_yuan/maishuiba.com/cache/8b/25e7d/72c9d.html): failed to open stream: No such file or directory in /www/wwwroot/new16.com/func.php on line 115
Our electrical devices all reach the standard through the test by the National electromechanic Lab._Company News_News_QINGDAO XINCHENG CASTING MACHINERY CO.,LTD



  1. 好色先生TVAPP,好色先生下载安装,好色先生污污版,好色先生色黄APP

    Our electrical devices all reach the standard through the test by the National electromechanic Lab.

    2022-12-25 06:48:08


          Recently,the State Administration for Entry-Exit Inspection and Quarantine and Shandong Province Administration for Entry-Exit Inspection and Quarantine have completely tested the PLC which is our ordinary electrical control system of the shot blasting machine.Through test about more than 10 coefficients including the electrical components,the voltage,insulation and the electric resistance of the wire,and the waterproof,dustproof and antisepsis of the electric control box,the results all reach the standard of the exported eletric.

    網站地圖